top of page

Hind Yousif Omer

Architect & Project Manager

Home: Welcome
Home: Gallery

All Videos

All Videos

All Videos
Search video...
All Categories
All Categories
6- Experience Center & Headquarters

6- Experience Center & Headquarters

02:12
Play Video
1- Bank HQ Podium Development-  Dubai, UAE

1- Bank HQ Podium Development- Dubai, UAE

07:55
Play Video
1- Aloft Hotel & Element Hotel Apartments - Dubai, UAE

1- Aloft Hotel & Element Hotel Apartments - Dubai, UAE

03:07
Play Video
2- Taj Creek Side 5star Hotel- Dubai, UAE

2- Taj Creek Side 5star Hotel- Dubai, UAE

01:41
Play Video
Home: Video Player
Home: Gallery

Work Experience

MASAR EXPERIENCE CENTER & HEADQUARTERS  - MAKKAH, K.S.A

December 2019 - August 2020

Led the design of a landmark Experience Centre and Headquarters of a real estate developer in Saudi Arabia, from concept design to the preparation of Tender documents.

​

The project is part of the mega development of KING ABDULAZIZ ROAD lately renamed (MASAR) in Makkah, KSA.

The project required close coordination with consultants from different and unique disciplines working on the master plan development and the ongoing infrastructure construction on site.


Status of the Project: Under Construction.
Team size: 3 Architects, 7 Sub-consultants (Structure, Civil, MEP, ID, Landscape, Traffic Impact, FLS, QS)
Role in the Project:

  • Prepared project management and control plans and procedures.

  • Prepared sub-consultancy RFPs (Request for Proposal).

  • Negotiated and awarded contracts for the sub-consultancy services.

  • Led the project’s communication with the PMO, the client and the  design team.

  • Led the design coordination between the different disciplines design teams and the client’s team.

  • Managed the authorities approval processes.

  • Led the architectural and landscape concept designs.

  • Held weekly meetings with the client and presented the project design to the client and the authorities.

  • Directed the preparation of the Tender packages.

  • Managed the project construction cost and overlooked the preparation of the cost estimates and BoQs.

  • Managed closely the lead consultants (Architecture, Structure, Cost) resources including team deployment and design budget.

Software Used: Microsoft Project, Revit for architectural design, and Adobe InDesign for presentation.

Emirates NBD Bank Head Quarter Parking Building

Dubai, U.A.E

September 2019- November 2019

Prepared the concept design of a multi-story parking for a bank headquarters in Meydan Business park, Dubai, UAE.
Status of the Project: Under Construction.
Team size: 3 Architects
Role in the Project:

  • Provided the design proposal for the project including the space planning and Façade  design.

Software Used: Revit for architectural design, and Adobe InDesign for presentation.

EXPO 2020 MONACO PAVILION,

Dubai, U.A.E

December 2018- August 2019

Worked with a  design team of 3 architects on the designing of a deluxe serviced apartments Operated by the Intercontinental in Business Bay, The Project is a 3B+G+2P+20 Tower with 31,000 sqm built up area.
Status of the Project: Construction Completed.
Team size: 3 Architects, 5 Sub-consultants (Structure, MEP, Sustainability, Security, FLS)
Role in the Project:

  • Provided design proposals of space planning and Façade  design.

  • Producing design reports.

  • Coordinate with Client team and design team to finalize design

  • Preparing Submission Packages to EXPO

  • Preparing Design Change Submissions

Software Used: Revit for architectural design, and Adobe InDesign for presentation.

Emirates NBD Bank Head Quarter Extension

Dubai, U.A.E

September 2018 - November 2018

Led a design team of 3 architects on designing the podium extension for Emirates NBD Bank head quarters in Meydan Business Centre, Dubai.
Status of the Project: Under Design.
Team size: 3 Architects, 3 Sub-consultants (Structure, MEP, FLS, Traffic Impact)
Role in the Project:

  • Providing design proposals of space planning and Façade  design.

  • Producing design reports.

  • Coordinating with the client team and design team to deliver the project

  • Producing 3D animation videos for client’s presentations.

Software Used: Revit, Lumion for rendering, Ecotect for simulation and Adobe InDesign for presentation.

InterContinental Residence - Dubai, U.A.E

April 2018 - August 2018

Worked  with a design team of 4 architects on the designing of the Intercontinental  serviced apartments Operated by the Intercontinental Hotel & Resorts, in Business Bay, The Project is a 3B+G+2P+20 Tower with 31,000 sqm built up area.
Status of the Project: Under Construction.
Team size: 4 Architects, 7 Sub-consultants (Structure, MEP, ID, Lighting, Landscape, F&B, Kitchen, FLS)
Role in the Project:

  • Provide design proposals of space planning and Façade  design.

  • Produce concept design reports.

Software Used: Revit for architectural design, and Adobe InDesign for presentation.

Langham Luxury 5star Hotel - Jeddah, K.S.A

April 2017 - March 2018

Led a  design team of 3 architects on the preparing the Concept design to detailed design of a 287 Key, 5 star Luxury hotel with a large Business and convention centre of 89,000 sqm built-up area, operated by Langham Hotels & Resorts.
The  design team consisted of a large number of sub-consultants and specialists; acting as the lead consultant we had to lead a tremendous coordination effort to  synchronize the different design aspects and specialists input.
Status of the Project: Under Construction.
Team size: 3 Architects, 7 Sub-consultants (Structure, ID, Lighting, Landscape, Facade Design, Kitchen Design,  FLS)
Role in the Project:

  • Attend client meeting.

  • Produce design proposal.

  • Produce design reports.

  • Carry out coordination with sub-consultants.

  • Produce design details.

  • Prepare Drawings for Authorities Approvals.

Software Used: AutoCAD, and Adobe InDesign for presentation.

GMG Company HQ Campus - Dubai, U.A.E

March 2017 - April 2017

Worked with a design team of 3 architects on designing of the company headquarters in Meydan Business Park area, The project was B+G+3 compound  with 109,000 sqm built up area in a 80,000 sqm plot of land.
Status of the Project: On hold in concept design stage.
Team size: 3 Architects
Role in the Project:

  • Provide design proposals of space planning and Façade  design.

  • Produce design reports.

  • Produce 3D animation videos for client’s presentations.

Software Used: Revit, Lumion for rendering, Ecotect for simulation and Adobe InDesign for presentation.

Al-owais Luxury Apartment Building - Dubai, U.A.E

December 2016 - February 2017

Prepared design proposals for a Luxury apartment building in Meydan Diamond Business Park for Alowais Developers.
Status of the Project: On hold in concept design stage.
Team size: 1 Architect
Role in the Project:
Providing design proposals of space planning and Façade design.
Producing design reports.
Providing design simulation and analysis in Ecotect.
Producing 3D animation videos for client’s presentations.
Software Used: Revit, Lumion for rendering, Ecotect for simulation and Adobe InDesign for presentation.

Katara Leisure Complex (6star Hotel + 5star Hotel)- Doha, Qatar

August 2016 - November 2016

Worked with  a design team of 21 architects on the preparing the final design submission for this mega project from our office in Germany, the Katara Hotel in Lusail Marina Doha, Qatar is set to be the Landmark of Doha opening for the 2022 world cup. 
Status of the Project: Under Construction.
Team size: 21 Architects, 8 Sub-consultants (Civil, Structure, ID, Lighting, Landscape, Facade Design, FLS, Kitchen, Traffic Design)
Role in the Project:

  • Incorporating the client’s design changes and coordinating with the other disciplines and the site team.

  • Producing design reports.

  • Carrying out coordination with sub-consultants.

  • Producing design details.

  • Producing final design set.

  • Prepared Drawings for Authorities Approvals.

Software Used: Revit, and Adobe InDesign for presentation.

Olaya Residential Compound - Ryadh, K.S.A

February 2016 - August 2016

Worked with a design team of 3 architects on the designing of a luxury residential compound in Riyadh compromised of 3 residential towers and, the project was G+20 in 10,607sqm land.
Status of the Project: On hold in Concept design stage.
Team size: 3 Architects
Role in the Project:

  • Provided design proposals of space planning and Façade  design.

  • Carrying out coordination with sub-consultants.

  • Producing design reports.

  • Providing design simulation and analysis in Ecotect

  • Producing 3D animation videos for client’s presentations.

Software Used: Revit, Lumion for rendering, Ecotect for simulation and Adobe InDesign for presentation.

Home: CV
Home: Contact

Taj Creek Side Hotel - Dubai, U.A.E

June 2015 - July 2016

Worked with a design team of 4 architects on the designing of 5 star hotel in Dubai, the project was G+19 on the Creek Water front.
Status of the Project: Cancelled because of feasibility issues.
Team size: 4 Architects, 7 Sub-consultants (Structure, MEP, ID, Lighting, Kitchen, Landscape, FLS).
Role in the Project:

  • Attending client meeting.

  • Carried out coordination with sub-consultants.

  • Provide design proposals of space planning and Façade design.

  • Produced design reports and 3D animation for client’s presentations.

  • Providing design simulation and analysis in Ecotect.

Software Used: Revit, Lumion for rendering, Ecotect for simulation and InDesign for presentation.

Aloft Hotel & Elements Hotel Apartments by Westin  - Dubai, U.A.E

January 2015 - June 2015

Worked with a design team of 4 architects on the designing of 4 star hotel and serviced apartments in Dubai, the project was G+4 in 8,600sqm land.
Status of the Project: Construction Completed 2019.
Team size: 4 Architects, 7 Sub-consultants (Structure, MEP, ID, Lighting, Kitchen, Landscape, FLS)
Role in the Project:

  • Attending client meeting,

  • Carried out coordination with sub-consultants. Consultants

  • Provide design proposals of space planning and Façade design.

  • Producing design reports and 3D animation for client’s presentations.

  • Prepared Drawings for Authorities Approvals.

Software Used: Revit, Lumion for rendering, Ecotect for simulation and Adobe illustrator for presentation.

LEGOLAND DUBAI  - Dubai, U.A.E

November 2013 - December 2014

Status of the Project: Construction Completed 2015.
Team size: 11 Architects, 8 Consultants (Civil, Structure, MEP, ID, Lighting, Theme Parks specialist, Kitchen, Landscape)
Role in the Project:

  • Handled the communication of project information with the project team’ the Project managers and sub consultants.

  • Looked after the organization and control of the projects documents. 

  • Prepared project records and control system and supervised  the implementation of the procedures with the project’s Documents controller.

  • Oversaw the implementation of the clients documents control protocol and handled the quality control of the submissions documents.

  • Worked on the preparation of the detailed design.

  • Prepared Drawings for Authorities Approvals.

  • Prepared Construction drawings and contract documents.

Software Used: AutoCAD, Microsoft Office, PMWeb.

Get in Touch

+971569821315

Thanks for submitting!

©2018 by Hind Yousif Omer. Proudly created with Wix.com

bottom of page